Case 03 · What I builtOperations · Project management · Contracts

Business Systems Transformation

Led each platform migration in-house — rebuilt the workflows, permissions and automations, and moved the live data with nothing lost.

My role
Project lead for each transition · Requirements and process redesign · Field mapping and permissions · Automation rebuild · UAT, training and rollout
Built with
Work-management platforms · Collaboration suite · E-signature platform · APIs and webhooks · Workflow automation
Anonymized and reconstructed for public presentation.
What I built, in action

I moved live records between platforms — and lost none.

Done in-house with exports, scripts and checks — outside migration partners typically charge $8k–60k per platform move.

Old platform
New platform
CHECKPOINT
0 / 1,284 records · 0 missing

Drag to move the batches. Fictional numbers.

Previous platform
Requests
Approvalsbreaks ✕
Automations
Reportsbreaks ✕
New platform
Requestsrebuilt
Approvalsrebuilt
Automationsrebuilt
Reportsrebuilt
The platform has to change
and the team can't stop working
batch 1/3
batch 2/3
batch 3/3
Backed up first
re-runnable
Source
1,284
Moved
1,284
Missing · dup
0 · 0
✓ UAT✓ Training✓ Live
● Before
01 · The problem I was asked to solve
From · Operations, project and contract teams

As the business evolved, the platforms running day-to-day operations and contracts had to change. Each transition risked breaking how work was requested, approved, tracked and reported.

02 · What I built
  1. 01Requirements and process architecture for each new platform
  2. 02Rebuilt data structures, permissions, integrations and automations
  3. 03A backed-up data migration for live, changing data — every field typed, related tables relinked, every record reconciled against the source
  4. 04UAT, documentation, training, rollout and post-launch support
03 · What changed after I built it

The core migration was completed in under one month. Each transition delivered rebuilt workflows, fields, permissions, automations and integrations — with UAT, documentation and rollout support — not simply migrated records.

  • A platform change risked breaking requests, approvals and reporting
    Each transition rebuilt the operating logic first, then moved the records
  • Live data kept changing while it had to move
    Backed up first, moved in re-runnable batches and reconciled against the source
  • Automations and integrations lived around the old tool
    Triggers, notifications and integrations rebuilt and tested on the new platform
  • Teams had to relearn their work on their own
    UAT, documentation and training shipped with each rollout
04 · Try a demo of what I built

Run my migration-readiness checklist

A simplified version of the checklist I ran for each transition. Tick items layer by layer and see when the platform is ready to cut over.

  • Select any item to see what breaks if it is skipped.
  • Cutover only unlocks when every layer is complete — including adoption.
01Process
1/3
02Data
1/4
03System
1/3
04Automation
0/3
05Adoption
0/3
If this is skipped
Rebuild triggers

Work stops moving on its own.

Cutover readiness
19%
Not ready — open items in Process, Data, System, Automation, Adoption
Simplified demo of a system I built · fictional data
05 · Go deeper

How I thought about it, how I delivered it, and the system underneath

The two moves that carried the most risk, in detail.

The playbook, repeated for every platform change
  1. 01Discover
    • Business requirement discovery
    • Process mapping
  2. 02Design
    • Workflow redesign
    • Field mapping
    • Permissions
  3. 03Build
    • Configuration
    • Data migration
    • Automation rebuilds
  4. 04Validate
    • Testing
    • UAT
  5. 05Launch
    • Documentation
    • Training
    • Rollout
    • Post-launch support
Repeated each time the underlying platform changed.